I had a feeling he couldnt do this the way he handled it. there were some changes we sat and went through together, but i called him two weeks later to ask him the cost of these changes, and his reply was that we should be about even on these changes, again nothing in writing and false information givin to me, as the costs were extremely high. i would not have asked him to do those changes if he would have told me the accurate costs on this, as i would not have been able to afford it. can he still charge me for this?